In India, land is more than property. It is a home, a source of income, and an identity. Therefore, the law must treat it with care when the State takes it. The Land Acquisition, Rehabilitation and Resettlement Act 2013 sets that standard. This law replaced a colonial statute and gave landowners real rights.
Here, the guide explains the law in plain words. First, you will learn what the Land Acquisition, Rehabilitation and Resettlement Act 2013 covers. Next, you will follow each step of the acquisition process. Then you will see how compensation works and which benefits families receive. Finally, you will read the key court rulings, including a September 2026 Supreme Court decision.
Quick answer: The Land Acquisition, Rehabilitation and Resettlement Act 2013 is a central law on how governments acquire private land. It demands a social impact assessment, fair compensation, and rehabilitation for every affected family. Moreover, it requires consent in certain projects. Its commencement date is 1 January 2014.
What Is the Land Acquisition, Rehabilitation and Resettlement Act 2013?
The Land Acquisition, Rehabilitation and Resettlement Act 2013 is Act No. 30 of 2013. Parliament passed it in 2013, and the President gave assent on 26 September 2013. Enforcement began on 1 January 2014. Its full title is the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. Lawyers also call it the LARR Act or the RFCTLARR Act.
The Ministry of Rural Development administers the law through its Department of Land Resources. Altogether, the statute has 114 sections and four schedules. In addition, the Land Acquisition, Rehabilitation and Resettlement Act 2013 applies across the country, subject to State rules.
The long title states the goal clearly. Its aim is a humane, participative, informed, and transparent process. Furthermore, it wants affected families to become development partners. Thus, the Land Acquisition, Rehabilitation and Resettlement Act 2013 treats acquisition as a shared project, not a one-sided taking.
Importantly, the law covers two groups. Landowners form the first group. The second group includes families who lose their livelihood without owning land. Examples include tenants, artisans, and forest dwellers. Hence, the Land Acquisition and Rehabilitation and Resettlement Act 2013 protects people the old law ignored.
Why Parliament Replaced the Land Acquisition Act 1894
For over a century, the Land Acquisition Act 1894 governed compulsory acquisition. The British enacted it to serve colonial needs. Consequently, it favoured the State and ignored the displaced. Therefore, the Land Acquisition, Rehabilitation and Resettlement Act 2013 began as a direct answer to that imbalance.
The old law had serious gaps. It offered no resettlement. Consent was never required. Besides, it allowed no study of social harm. An urgency clause let officials skip hearings altogether. Compensation, meanwhile, often fell far below the real market price.
Public anger grew over time. Protests in places such as Singur, Nandigram, and Bhatta Parsaul shaped the debate. As a result, the Government introduced a new bill in the Lok Sabha on 7 September 2011. Parliament passed it two years later.
The Land Acquisition and Rehabilitation and Resettlement Act 2013 therefore marks a turning point. It moved India from a State-first model to a rights-based model. Likewise, it linked compensation with rehabilitation for the first time. Today, lawyers still compare every acquisition against this shift.
Where the Land Acquisition, Rehabilitation and Resettlement Act 2013 Applies
Scope matters because it decides which safeguards you can claim. A wrong assumption here can cost an owner months. Therefore, read the notice first, and then match it to the categories below.
Acquisition by the Government
Section 2 defines the scope. The Land Acquisition, Rehabilitation and Resettlement Act 2013 applies when the appropriate Government acquires land for its own use. That includes public sector undertakings. It also covers any public purpose listed in the statute.
Public purposes include defence works, infrastructure, and housing for the people whose income is below the poverty threshold. In addition, they cover planned development, educational institutions, and projects for displaced families. The list is wide. Still, courts expect the State to prove a genuine public purpose.
Private Companies and PPP Projects
The Land Acquisition and Rehabilitation and Resettlement Act 2013 also reaches private players. When a government acquires land for a private company, consent becomes mandatory. Such a company must secure approval from at least 80 per cent of affected families. For public-private partnership projects, the threshold is 70 per cent.
Moreover, the rehabilitation provisions apply when a private company buys land directly. This rule applies once the purchase crosses limits set by the appropriate Government. Consequently, large private purchases cannot dodge resettlement duties.
Notably, the Land Acquisition and Rehabilitation and Resettlement Act 2013 speaks of the “appropriate Government.” For most projects, that means the State. Central projects fall under the Centre. Therefore, you must check which Government issued your notice.
Key Features of the Land Acquisition, Rehabilitation and Resettlement Act 2013 at a Glance
The table below summarises the main features. Use it as a quick reference.
| Feature | What the Act Provides |
|---|---|
| Social Impact Assessment | Mandatory study with public hearings |
| Consent | 80% for private projects; 70% for PPP projects |
| Compensation | Market value multiplied by a factor, plus 100% solatium |
| Rehabilitation | Housing, allowances, and jobs or annuity |
| Time limits | Strict deadlines for declaration, award, and possession |
| Dispute forum | Land Acquisition, Rehabilitation and Resettlement Authority |
| Return of land | Unused land returns to owners or a land bank |
| Special protection | Extra safeguards for SC and ST communities |
Each feature of the Land Acquisition, Rehabilitation and Resettlement Act 2013 works as a check on State power. Together, they form a layered system. Hence, a missed step can make an acquisition vulnerable in court.
Step-by-Step Acquisition Procedure Under the Land Acquisition, Rehabilitation and Resettlement Act 2013
Step 1: Social Impact Assessment
The process under the Land Acquisition, Rehabilitation and Resettlement Act 2013 begins with a social impact assessment, or SIA. Sections 4 to 6 govern this stage. Officials must consult the local self-government body. Then they must hold a public hearing in the affected area.
The SIA studies the project’s real costs. It looks at displacement, livelihood loss, and effects on public services. In addition, the report must reach the public in local languages. As a result, families can read it and respond.
Step 2: Expert Group Review and Food Security
Next, an independent expert group appraises the SIA. This group includes social scientists, rehabilitation experts, and local body members. It recommends whether the project should proceed.
Section 10 protects food security. The State should not acquire irrigated multi-crop land except as a last resort. Furthermore, it must offset any such acquisition by developing wasteland elsewhere. Thus, the law balances growth with farming.
Step 3: Preliminary Notification and Objections
After approval, the Government issues the preliminary notification under Section 11. It appears in the Gazette, in newspapers, and on official websites. The Gram Sabha also receives it.
Landowners then have 60 days to file objections. The Collector must hear each objection. Subsequently, the Collector submits a report to the Government.
Step 4: Rehabilitation Scheme, Declaration, and Award
An Administrator prepares the rehabilitation and resettlement scheme. A public hearing follows. Afterwards, the Government issues the final declaration. It must do so within 12 months of the preliminary notification. Otherwise, the proceedings lapse.
The Collector must then pass the award within 24 months of the declaration. Again, delay kills the acquisition. Finally, the State takes possession only after paying compensation in full. That rule appears in Section 38.
How Compensation Works Under the Land Acquisition, Rehabilitation and Resettlement Act 2013
Calculating Market Value
Section 26 of the Land Acquisition, Rehabilitation and Resettlement Act 2013 sets the formula. The Collector first fixes the market value. This figure is the higher of two values. One is the minimum land value under the stamp law. Another is the average sale price of similar land nearby over the previous three years. For that average, the Collector uses the top half of the recorded sale deeds.
In private and PPP projects, the agreed amount may also count. Additionally, the Collector must value buildings, trees, and standing crops separately. Therefore, owners should document every asset on the plot. Photographs, tax receipts, and a registered valuer’s report carry the most weight before the Collector.
Multiplier and Solatium
Next, the Collector applies a multiplying factor. In rural areas, the factor ranges from one to two, depending on distance from the urban centre. Urban areas use a factor of one. Then the Collector adds solatium equal to 100 per cent of the compensation.
Because of this structure, rural owners can receive up to four times the market value. Urban owners can receive up to twice the market value. In contrast, the 1894 law paid a far smaller solatium.
Interest and Urgency Compensation
The Land Acquisition, Rehabilitation and Resettlement Act 2013 also adds interest. It runs at 12 per cent a year on the market value. Interest accrues from the preliminary notification until the award or possession.
In genuine emergencies, the State may use the urgency power. This power is narrow. It applies to defence needs and natural calamities. If the State uses it, the owner receives an extra 75 per cent of the compensation.

Rehabilitation and Resettlement Entitlements
The Land Acquisition and Rehabilitation and Resettlement Act 2013 breaks new ground here. Beyond money for land, every affected family gets a package. Its Second Schedule lists the entitlements.
A displaced family receives a house in the resettlement area. In rural zones, the house follows the standards of the rural housing scheme. Urban zones receive a plinth area of 50 square metres. Moreover, families get a subsistence allowance for one year. They also receive transport and resettlement grants.
Employment forms a major part of the package. The family may choose one of three options. First, one member may receive a job. Second, the family may take a one-time payment. Third, it may opt for a monthly annuity for twenty years. Because the Schedule updates over time, check the current figures in your State notification.
Special groups receive more. Scheduled Caste and Scheduled Tribe families gain extra allowances and land rights. In irrigation projects, the Schedule offers land for land. Similarly, fishing communities and other livelihood groups receive support.
The Third Schedule adds amenities. These include roads, schools, health centres, and drinking water. Hence, a resettlement site must work as a real community, not a transit camp. Authorities must also finish these amenities within 18 months. Meanwhile, the Collector cannot treat these duties as optional extras. They form part of the lawful price of acquisition, and courts have said so.
Consent, Public Purpose, and the Role of Gram Sabhas
Consent is central to the Land Acquisition, Rehabilitation and Resettlement Act 2013. The statute uses it as a tool for democratic control. Without the required approval, a private or PPP acquisition cannot go ahead.
The law requires consent in a verifiable manner. Officials must record it at a public meeting. Furthermore, the Collector must certify the percentage obtained. Courts have treated false records as a serious defect.
Public purpose also deserves attention. The State must show a real link between the land and the project. Otherwise, owners can challenge the notification. Courts apply a reasonableness test. They also look at whether the State took the minimum land needed.
Gram Sabhas play a major role in rural areas. They hear SIA findings and discuss the rehabilitation plan. In Scheduled Areas, their role grows even more. Thus, the Act links land law with local democracy. Practically, a Gram Sabha resolution passed after open debate outweighs a signature drive run by the proponent.
Consent rules under the Land Acquisition, Rehabilitation and Resettlement Act 2013 do not apply to every government project. When the State acquires land for its own use, the 80 and 70 per cent thresholds do not apply. However, the SIA duty still does. Accordingly, the nature of the project decides which safeguards apply.
Special Protection for Scheduled Castes and Scheduled Tribes
Section 41 of the Land Acquisition and Rehabilitation and Resettlement Act 2013 offers targeted protection. The State must treat acquisition in Scheduled Areas as a last resort. Moreover, it must obtain the prior consent of the Gram Sabha or Panchayat in those areas.
The Act also demands a development plan. It must cover the affected tribal families. Their customs and traditions deserve respect. In addition, it should ensure access to forest produce and common resources.
Compensation rules differ too. Scheduled Caste and Scheduled Tribe families receive one-third of the compensation amount upfront. This payment helps them restart their lives. Similarly, resettlement must happen within the same block where possible.
Section 41 reflects a deeper constitutional concern. Many tribal communities depend on land for survival and culture. Accordingly, the law gives them procedural and financial shields. Consequently, a failure to follow these steps weakens the acquisition.
Practitioners often raise these points in writ petitions. Courts have shown willingness to examine the Gram Sabha record. Therefore, families should preserve minutes, attendance sheets, and resolutions.
Authority, Dispute Resolution, and Appeals
The Land Acquisition, Rehabilitation and Resettlement Act 2013 creates a dedicated forum. Section 51 establishes the Land Acquisition, Rehabilitation and Resettlement Authority. A retired or serving district judge usually presides over it. Together with members, the Presiding Officer handles disputes under the Land Acquisition and Rehabilitation and Resettlement Act 2013.
An aggrieved person can seek a reference. Section 64 allows a landowner to challenge the award on grounds such as market value, solatium, or rehabilitation. Owners must act within the time limit stated in the Act. Generally, that limit is six months from the award.
The Authority decides the matter after hearing both sides. It aims to dispose of references within six months. Furthermore, it can enhance compensation when the Collector undervalues the land.
Dissatisfied parties may appeal to the High Court. Section 74 provides this remedy. The appeal must reach the court within 60 days. Beyond that, parties may move the Supreme Court.
Besides the Authority, owners can file writ petitions. High Courts hear writs against illegal notifications. They also review procedural lapses under Article 226. Therefore, two routes exist: a statutory reference for money disputes, and a writ for legality.
Return of Unused Land and Benefit Sharing
The Land Acquisition and Rehabilitation and Resettlement Act 2013 stops speculative acquisition. Section 101 requires return of unutilised land. If the requiring body leaves the land unused for five years, the land goes back to the original owners or heirs. Alternatively, it moves to the State land bank. Projects may set a different period.
Section 102 bars a change of purpose. The State cannot use the land for a different project without fresh approvals. Hence, officials cannot acquire land for a school and build a mall. Similarly, a body cannot park acquired land idle for decades while owners wait.
The Act also protects owners against profiteering. If the body transfers the land without development, the original owners share in the gain. That share equals forty per cent of the appreciated value. This clause discourages land trading by public agencies.
Moreover, the Act requires the State to keep a register of acquired land. It must track use and report on progress. As a result, citizens can verify whether a project actually uses the land taken.
Section 24 and the Transition From the 1894 Law
Section 24 of the Land Acquisition, Rehabilitation and Resettlement Act 2013 handles pending cases. Two limbs matter. Under Section 24(1)(a), if no award existed before 1 January 2014, the 2013 compensation rules apply. Meanwhile, under Section 24(1)(b), existing awards continue under the old law.
Section 24(2) caused the biggest litigation wave. It says an acquisition lapses in one situation. An award must have been made five years or more before the new Act. Further, the State must have failed to take possession or pay compensation.
Courts split on its meaning. In 2014, the Supreme Court read it in favour of owners in the Pune Municipal Corporation case. Later, the Constitution Bench corrected that view in Indore Development Authority v. Manoharlal in 2020. It held that both failures must exist together. Thus, if the State took possession or paid compensation, no lapse occurs.
The Bench also held that the State pays by tendering the amount. It need not deposit the money in court. In addition, the time during which a court stay operated gets excluded. Finally, the section does not revive stale claims.
Since 2020, High Courts have set aside many lapse orders. For example, the Supreme Court reversed several Delhi High Court decisions in 2022 and 2023. Therefore, owners now face a tougher road under Section 24(2).
Other Laws Covered: The Fourth Schedule and National Highways
Section 105 and the Fourth Schedule extend the benefits of the Land Acquisition and Rehabilitation and Resettlement Act 2013. The Schedule lists enactments such as the National Highways Act 1956 and the Railways Act 1989. Initially, the compensation provisions of the Land Acquisition, Rehabilitation and Resettlement Act 2013 did not reach them. A later government notification brought them in from 1 January 2015.
This extension created fresh disputes. Landowners argued that the better regime should apply. Governments argued that older awards stay under the 1894 law. Consequently, the date of the award became decisive.
In September 2026, the Supreme Court addressed this issue in Manav Bhanot v. National Highway Authority of India. The Court held that the date of the competent authority’s determination controls. If the award came before 1 January 2015, solatium and interest follow the 1894 Act. Later awards fall under the 2013 Act.
This ruling matters for highway projects. Many arbitrations and appeals still run. Hence, owners must check the exact date of the competent authority’s order. Likewise, lawyers should map every date in the chain: notification, declaration, determination, and arbitral award.
Amendments, the 2014 Ordinance, and State Variations
The Land Acquisition, Rehabilitation and Resettlement Act 2013 faced early political pressure. In December 2014, the Government issued an ordinance. It sought to exempt certain categories from consent and the SIA. Parliament did not pass the related bill. Eventually, it lapsed in 2015.
After that, the Centre chose a different route. It left the Land Acquisition and Rehabilitation and Resettlement Act 2013 intact. Instead, it encouraged States to make their own changes. Section 108 lets States enact laws that are more beneficial to affected families. Several States also moved amendments that eased the SIA or consent rules for chosen projects.
Reports show that States such as Gujarat, Tamil Nadu, Telangana, and Jharkhand adopted such changes. Each amendment needed Presidential assent. Thus, you must read the State version before you advise a client.
Alongside these changes, many States passed their own rules under the Land Acquisition, Rehabilitation and Resettlement Act 2013. These rules cover SIA procedure, valuation multipliers, and rehabilitation schemes. For instance, rural multipliers differ between States. Consequently, two owners in different States can receive different amounts for similar plots. Moreover, the local rules may change a deadline by weeks, so a quick check of the State gazette is essential.
The Land Acquisition and Rehabilitation and Resettlement Act 2013 therefore works as a framework, not a uniform code. Always read the central law together with State rules and notifications.
Landmark Judgments Shaping the Land Acquisition and Rehabilitation and Resettlement Act 2013
Indore Development Authority v. Manoharlal (2020)
This Constitution Bench ruling settled Section 24(2). It overruled the earlier Pune Municipal Corporation view. Its holding on tender of payment and exclusion of stay periods governs courts today. Almost every later lapse case relies on it.
Kolkata Municipal Corporation v. Bimal Kumar Shah (2024)
In May 2024, the Supreme Court interpreted Article 300A of the Constitution. That Article says the State cannot deprive anyone of property except by authority of law. The Court listed seven sub-rights that every acquisition law, including the Land Acquisition, Rehabilitation and Resettlement Act 2013, must honour.
These rights are notice, hearing, and a reasoned decision. They also include acquisition only for a public purpose, fair compensation and restitution, an efficient and expeditious process, and a conclusion of the process. Furthermore, the Court said missing even one can expose the law to challenge. The Land Acquisition, Rehabilitation and Resettlement Act 2013 already contains most of these protections. As a result, owners now cite the judgment against any shortcut.
Manav Bhanot v. National Highway Authority of India (2026)
Delivered on 8 September 2026, this is among the latest decisions. A bench of Justices J.B. Pardiwala and K. Vinod Chandran heard the case. It held that the award date, not the date proceedings began, decides which law applies for solatium and interest. The Court also said that a later arbitral award does not shift the regime.
Expert Insight: What Courts Look for in Acquisition Cases
Experience shows that most challenges succeed or fail on process, not on emotion. Judges ask a short set of questions. Did the State follow each statutory step? Has it recorded each decision with reasons? And did it meet each deadline?
Under the Land Acquisition, Rehabilitation and Resettlement Act 2013, the record becomes the case. A thin file invites an adverse inference. In contrast, a thick file protects both sides. Therefore, officials should keep minutes, notices, proofs of publication, and payment receipts in order.
Owners can use the same logic. Submit objections in writing. Keep copies with a dated acknowledgment. Furthermore, attend every hearing and sign the attendance sheet. These small habits often decide a writ petition years later.
Courts also weigh proportionality. They examine whether the State could have used less land or an alternative alignment. In addition, they check whether the project serves the stated public purpose. When the answer is doubtful, the Land Acquisition and Rehabilitation and Resettlement Act 2013 gives judges ample room to intervene.
Finally, courts value good faith. A State that pays promptly and resettles families on time rarely loses. In contrast, a State that skips hearings often does. Thus, compliance is both the fair path and the safe path.
Common Legal Issues and Practical Challenges
Several recurring problems arise when officials apply the Land Acquisition, Rehabilitation and Resettlement Act 2013 in practice. First, officials sometimes skip or rush the SIA. Courts expect real public hearings, not paper compliance. Second, the urgency power faces misuse. Owners should demand proof of a true emergency.
Third, valuation disputes dominate compensation cases. Sale deeds often understate prices. Hence, the Collector’s average can fall below real values. Owners should therefore produce comparable sales and expert valuation reports.
Fourth, possession before payment violates Section 38. Yet it still happens. In such cases, owners can seek relief through writ petitions. Fifth, the mixed regime creates confusion. Projects that began under the 1894 law now run alongside the 2013 framework.
Moreover, rehabilitation often lags behind compensation. Families receive money but wait years for housing and jobs. Consequently, the National and State monitoring committees matter. They review implementation and report on gaps.
Finally, tenants and landless workers struggle to prove their status. The Act includes them. Still, they must show records or community verification. Accordingly, local officers should map all affected families early.
Practical Checklist for Landowners
Act quickly when you receive a notice under the Land Acquisition and Rehabilitation and Resettlement Act 2013. Use the following steps to protect your rights:
- Verify the notification. Check its date, its authority, and the stated purpose.
- Attend the SIA hearing. Submit written comments and keep a receipt.
- File objections within 60 days. Cite specific legal defects.
- Collect valuation proof. Gather sale deeds, tax records, and photographs.
- List every asset. Include trees, wells, buildings, and standing crops.
- Claim rehabilitation benefits. Ask for each entitlement in writing.
- Track the deadlines. Note the 12-month and 24-month limits.
- Seek a reference in time. Apply to the Authority within the limit.
- Consult an advocate early. Local counsel knows State rules and practice.
Conclusion
The Land Acquisition, Rehabilitation and Resettlement Act 2013 changed how India acquires land. It replaced a one-sided colonial law with a rights-based framework. Today, it demands study, consent, fair payment, and rehabilitation.
Courts continue to refine the law. These rulings show an active field. They include the 2020 Constitution Bench decision, the 2024 Article 300A judgment, and the September 2026 highway ruling. Accordingly, both owners and officials must watch each development.
In short, knowing the Land Acquisition and Rehabilitation and Resettlement Act 2013 gives you real bargaining power. Read your notice with care. Meet every deadline. Keep every document. Then use the Authority and the courts when the process fails. This article offers general information. Please consult a qualified advocate for advice on your specific case.
References
- The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 – India Code
- Bare Act text – BNB Legal
- Gazette of India, Extraordinary – Act as published (PDF)
- PRS Legislative Research – Bill as passed by Lok Sabha (PDF)
- People’s Archive of Rural India – Explainer on the Act
- Wikipedia – Overview of the 2013 Act
- Jindal School of Government and Public Policy – Policy brief
- Housing.com – Supreme Court ruling on lapse of acquisition (Indore Development Authority)
- Lawlex – Indore Development Authority v. Manoharlal case note
- Supreme Court of India – North Delhi Municipal Corporation v. Ram Chander Singh (10 Feb 2023)
- Verdictum – Acquisition cannot lapse if Section 24(2) ingredients are unmet
- Supreme Court of India – Kolkata Municipal Corporation v. Bimal Kumar Shah (16 May 2024)
- LiveLaw – Seven sub-rights of the right to property under Article 300A
- Verdictum – Kolkata Municipal Corporation v. Bimal Kumar Shah (2024 INSC 435)
- IndiaLaw LLP – Seven procedural sub-rights for compulsory acquisition
- Verdictum – Manav Bhanot v. National Highway Authority of India (2026 INSC 973)
- Lekha News – Deputy Commissioner v. S.V. Global Mill Ltd. (2026), Section 24(1)(a)
- Verdictum – Delhi Development Authority v. Jagan Singh
FAQs on the Land Acquisition, Rehabilitation and Resettlement Act 2013
- 1. What is the Land Acquisition, Rehabilitation and Resettlement Act 2013?
The Land Acquisition, Rehabilitation and Resettlement Act 2013 is an Indian law that regulates the acquisition of private land for public purposes. It aims to balance development needs with the rights of landowners and affected families. The law provides rules for social impact assessments, public hearings, consent in specified cases, compensation, rehabilitation, and resettlement. It replaced the colonial Land Acquisition Act 1894 as the principal central framework. However, special laws and applicable State amendments may affect how its provisions operate in particular cases.
- 2. How is compensation calculated under the Land Acquisition Act 2013?
Under the Land Acquisition, Rehabilitation and Resettlement Act 2013, compensation depends on factors such as the market value of the land, the applicable multiplier, the value of attached assets, and statutory additional amounts. The calculation may differ between rural and urban areas. The Collector determines compensation under the Act and relevant rules. Affected landowners should check the preliminary notification, valuation records, land classification, and award details. If they disagree with the amount, they may pursue the remedies available under the law.
- 3. Can landowners object to land acquisition in India?
Yes. Section 15 of the Land Acquisition, Rehabilitation and Resettlement Act 2013 provides an opportunity for interested persons to object to a proposed acquisition after the preliminary notification under Section 11. The statutory objection period is generally 60 days from the date of publication of that notification. Objections may concern the land’s suitability, the justification for acquisition, or findings of the Social Impact Assessment. Affected people should submit their objections to the designated Collector within the applicable period and retain proof of submission.
- 4. What rehabilitation and resettlement benefits can affected families receive?
The Land Acquisition, Rehabilitation and Resettlement Act 2013 provides rehabilitation and resettlement entitlements for eligible affected families. Depending on the circumstances and applicable schedules, benefits may include housing assistance, subsistence allowances, transportation assistance, employment or annuity options, and other prescribed support. Certain provisions offer additional safeguards for Scheduled Castes and Scheduled Tribes. Eligibility depends on the statutory definition of an affected family, the acquisition details, and applicable rules. Families should review the rehabilitation and resettlement scheme and seek clarification from the competent authority if benefits are missing.
- 5. What happens if acquired land remains unused?
Section 101 of the Land Acquisition, Rehabilitation and Resettlement Act 2013 addresses the return of unutilised acquired land after five years from taking possession, or the period specified for the project, whichever is later. The land may be returned to the original owners or their heirs, or placed in a land bank, as provided by the section and applicable law. This is not an automatic rule that applies identically in every situation. Landowners should check the acquisition purpose, possession date, relevant State amendments, and judicial decisions before pursuing a claim.